Rig & sails

Standing rigging & chainplates

New chainplates, the forestay failure and the switch to Dyneema.

The mast stands on wires, and the wires stand on chainplates. If any link in that chain gives up, the mast comes down, usually with drama. On Vira almost every link needed work. I started with rotten chainplate mounts in my very first winter, and finished with brand new shrouds in 2026.

Taking the load off

Day 1122 Jan 2022

January 2022. First I dropped the sails, to take as much load off the mast as possible, and to clean and fix them. Folding sails alone is a bit tricky, but this deck is pretty good for short-handed work.

To get to the port lower shroud chainplate, I needed it free while the mast was still up. You can't just unpin a shroud with the mast standing. So I made a bracket and moved the tension to the toe rail. Not elegant, but with no big loads it should hold.

And look at this cotter pin. I was impressed, and not in a good way.

Welcome to hell

Day 11–1222–30 Jan 2022

The chainplate mount sits inside a molded cabinet in the head. Welcome to hell. Who designed it this way, and why, I have no idea, but it's not right. The two top bolts sat in totally rotten plywood.

It took three hours of boat yoga in the toilet to get that rotten board out. With the tools I had, I couldn't even finish all the prep sanding.

A week later I built the new mount. I kept the original tabbing on the sides and beveled it 12:1, three inches for every quarter inch of thickness. I chiseled the inside down to clean glass and left the glass "wool" on purpose, for more grip. Maybe that's wrong, but more surface can't hurt.

Then I glued three layers of 12 mm bakelite plywood together, 1.5 inches in total, wrapped it in epoxy-soaked mat and glued it in the original place. Then came four layers of 1708 on each side to match the original tabbing, and two more on the right side a few hours later. It was cold, so I left a heater running to keep 20 °C, because the slow hardener wants more than 16.

The next day I ground it again and added three more layers of 1708 on each side, tabbed to the hull in single pieces. I also measured the chainplates to make a new set.

And a bonus: my glassing workplace.

Oh, and I have a first aid kit on a board now. Given the tools involved, it was about time.

New chainplates

Day 13–2314 Feb – 23 Apr 2022

In February the new chainplates arrived. I tried to polish them. Not excellent, but they look good.

Next came the dry fit on the port side. I drilled the holes, drilled them out bigger and filled them with thickened epoxy, so the bolts never touch bare plywood. On the starboard side the mount got three layers of 1708 outside, three inside, and one layer of woven roving.

I machined little "humps" out of G10 for the places where the chainplates come through the deck, so water runs around them instead of into them.

In March I cut the deck openings, dry-fit the plates, and filled the holes in the deck and the top plates with thickened epoxy.

A couple of weeks later three of the four places were done. I beveled the deck slots and countersunk the holes, so the sealant gets squeezed properly, and sealed the plates and bolts with butyl tape. Inside, I wrapped paper around the chainplates, so I'll see right away if anything leaks. A wood block glued to the bulkhead gives the bolts better support. With all the extra glass, the original bolts were now a bit short, so each plate got only two bolts until the new ones came.

In April all the new bolts went in.

Then came the last two, on the port side, and the shrouds moved to the toe rail again. Somebody had simply caulked the cover plate onto the non-skid, with no real seal at all. So I took off the gelcoat, mounted a raised plate on the deck, and opened and filled the holes.

A week later the new port chainplates were in. I filled the old holes in the bulkhead and redrilled them in the right places, glued in a teak spacer, beveled and sanded the slots, and sealed everything with butyl.

Then I set the mast straight, left to right, with 15% load on the upper shrouds and less on the lowers. It was a nice day, too. Next door, turtles were sunbathing on somebody's sunken boat. They looked more relaxed than me.

I checked the wire sizes: 1/4 and 7/32. This $115 tension gauge from Amazon works well.

A welded forestay chainplate

Day 3325 Jun 2022

June 2022 brought a surprise: Irwin had welded a piece of stainless rod onto the forestay chainplate. It's original. I was in shock.

I looked into how to replace it and got more questions than answers. All the bow nuts are about 1.5 m from a tiny door in the corner of the V-berth. You can barely see them, never mind put a wrench on them.

The forestay fail

Day 34–373–18 Jul 2022

In July 2022 my friend went up the mast. On the forestay he found one strand broken and others unwinding.

I tried to push the forestay's threaded pin further in and couldn't. So I cut the wire again and reinserted it, but now the forestay is two inches shorter. I ordered new Sta-Lok inserts.

I also priced a full new set of standing rigging with Sta-Lok fittings: $2,672. Something to think about...

Then I thought I saw a crack in the chainplate at the starboard spreader. On a closer look it was just a scratch and dirt. But it got me going anyway. I drew a new set of plates: for the forestay and the backstay, backing plates for both, the top and mid-top plates, and the spreader plates. SendCutSend made them all, bending included, for $440. One more correction: the backstay plate only needs about 5 degrees of bend, not 14.

The same month I replaced the jib halyard.

No more shackle on the backstay

Day 66–804 Dec 2022 – 4 Mar 2023

In December 2022 I dealt with what really worried me: a 2,000 lb shackle in the backstay. A chain isn't the best answer either, but at least it's as strong as the wire. Now it's two plates and two 1/2-inch pins, and the plates are thicker than the old chainplate.

In March 2023 it was the backstay chainplate's turn. The old one was made, really badly, from some unknown stainless bar. The pin hole was off-center, almost at the edge, and the plate was only 3/16 thick. I went up to 1/4-inch 316, and used the old plate as a backer.

But the transom was about 1/8 inch thicker at the top two bolts than at the bottom two, so the backer couldn't sit flat. I ground off the gelcoat and laid three layers of 1708 on the lower part, shifted a bit, to flatten it, then one sheet over everything. I also filled the old oversized holes with epoxy and silica.

The epoxy came out red again. My fast hardener had been stored a long time. West System says metal can turn 205 hardener red or purple and that it doesn't change anything. When it cured, I drilled new holes and bolted the new chainplate on.

Planning Dyneema

Day 210–22323 Jul – 7 Sep 2025

By 2025 I was thinking about synthetic rigging. Here's what I had:

  • Forestay and backstay: 9/32 (7.14 mm), breaking at 3,500 kg. 15% is 525 kg.
  • Lower main shrouds: 1/4 (6.4 mm), breaking at 3,220 kg. 15% is 483 kg.
  • Other shrouds: 3/16 (4.76 mm), breaking at 2,100 kg. 15% is 315 kg.

For Dyneema I looked at Colligo hardware and Excel D12 Max with SK99 fiber, which is about 15–18% stronger than SK75/78 and creeps less. The sizes I noted: 6 mm, 7 mm and 8 mm.

I drew a rope guide for the spreader tips, so the upper and lower parts of the shroud make one closed loop and the load sits right on the bolt.

In August 2025 I measured the shroud angles. I took the picture from far away, to get closer to the real angles.

Then the mast end. The original connections are simple for steel, but synthetic can be simpler still. I designed tilted thimbles, made at my rigging angles, with a curved face that sits on the mast: one for the cap shrouds, and one with a bigger angle for the intermediates. Fewer parts, more reliable, and less stainless touching the aluminum.

And terminators for the chainplate end, with lacing holes shaped to give the rope a proper radius.

The same week, Vira became officially USCG documented. The number is on the main bulkhead.

New wire after all

Day 248–27118 Jan – 5 Jul 2026

So why wire? My plan was to have all the Dyneema fittings made by a prototype shop in China (JLCCNC). That would have been a premium solution for very reasonable money. Then the new US tariffs came, and the Dyneema solution suddenly became too expensive. So I postponed that project. For about 10 years ;)

In January 2026, at the boatyard, I picked up brand new stays, each made in one piece, the way they should be. The originals had extension plates, chains, extra toggles... Below are the chicken scratches I gave the rigger. He understood them, which says a lot about riggers.

When we stepped the mast, the pin that holds the port lowers at the spreader root slid out of place. I had to ease the lowers and push it back in.

In July 2026 Vira went sailing with a new main and new shrouds. From rotten plywood in the head to new wire from top to bottom: that chain is finally strong in every link.